Questions, answered
Pavilion FAQ
Honest answers about timelines, permits, HOA approval and building in Florida.
Your site & existing decks
What areas do you serve?+
Florida Pavilions is preparing to launch in 2027 across Greater Tampa Bay and Southwest Florida, including Hillsborough, Pinellas, Manatee and Sarasota counties. Service details will be announced at launch.
Can you build over my existing pool deck or pavers?+
Usually, yes. Florida wind code calls for engineered concrete footers at each column, so pavilions built over existing paver decks require lifting pavers at column locations, pouring the footers and relaying the pavers around the columns. Poured concrete decks are typically saw-cut only where footers are needed.
How close can the pavilion be to my property line, house or pool?+
It depends on your city or county, zoning and HOA. Many jurisdictions require 3–5 feet or more from property lines, often measured from the roof edge, and easements and underground utilities also limit placement.
Zoning, setbacks & trees
How close to my property line can a pavilion go?+
It depends on where you live. Many local codes allow detached accessory structures roughly 3–5 feet from side and rear lines, as long as they stay out of drainage and utility easements. Unincorporated Hillsborough, the City of Tampa, Pasco and Manatee each have their own numbers, and the City of Tampa also varies by zoning district. Your HOA can require more than the county.
What if my neighbor's tree hangs over my yard?+
It can still affect a project. Cities like Tampa protect certain trees, and the protected root zone grows with trunk size, so a large oak on the other side of the fence can reach into your yard. Digging for a pool, footers, a pool house or an ADU inside that zone can need City review first, so trees on both sides of the line matter when placing a structure.
Can a pavilion be built near a protected tree?+
Often, yes. An ISA-certified arborist can expose roots with an air spade, which doesn't cut them, and map where the major roots are. With that report, individual footers can be placed around the roots instead of a continuous trench, which cities are much more likely to approve.
What are the City of Tampa's tree protection distances?+
The City measures trunk diameter 4.5 feet above the ground. Grand Trees (32 inches or more) need a 20-foot protective distance from construction, and Specimen Trees (24 inches or more) need 15 feet. Your site plan must show every tree on your lot and any tree within 20 feet of your property line, including your neighbor's. Source: City of Tampa 2019 Landscape Technical Manual.
What are the City of Tampa setbacks for a pavilion or pool house?+
Under City Code §27-290, detached accessory structures in standard residential districts generally need 3 feet from side and rear lines. On a corner lot the street side is 7 feet for RS-60 and most smaller lots, and 15 feet for RS-75. A pavilion, pool house or ADU can't be taller than your home in height or number of stories. Check your zoning district on the City's GIS map.
I'm in a flood zone — what changes for a pavilion or outdoor kitchen?+
If your lot is in a FEMA flood zone, the plans must show your Design Flood Elevation (DFE). Only one electrical outlet is allowed below the DFE; other electrical, plumbing and equipment like water heaters or AC units must sit above it. In Coastal A or VE zones, nothing electrical or plumbing can attach to breakaway walls. Source: City of Tampa flood requirements technical guide.
Does artificial turf need a permit in Tampa?+
Yes — a BLD Miscellaneous permit. Turf can't go in the right-of-way, public easements or drainage swales. To count as pervious (0% toward your impervious limit) it needs a backing that drains at least 10 inches per hour over at least 4 inches of clean stone; a plastic liner makes it count as 100% impervious. You also need a notarized Synthetic Turf Verification Statement, a cross-section drawing and proof of no rubber infill.
Does a pavilion need a building permit?+
Generally, yes. Some small sheds and some open pergolas without a roof or electrical are exempt in certain places, but a pavilion with a solid roof, engineered footers and wired lighting is typically permitted with signed and sealed engineering — which is also what lets it stand up to hurricane winds.
HOA & architectural review
What if I can't find my property survey for the HOA or permit?+
If you have or had a mortgage, a boundary survey was almost always done when you bought the home, and the title company that handled your closing usually keeps a copy on file. 1) Look up your address on your county Property Appraiser website (Hillsborough, Pinellas, Manatee, Sarasota or Pasco). 2) Open the recorded deed from your purchase. 3) Near the top, find "This instrument prepared by" or "Return to" — that is your title company. 4) Call them, confirm you are the owner, and ask for the survey from your closing file. Many will email it the same day.
Does my city require a tree or topographical survey?+
Most master-planned communities only need a standard boundary survey. Some cities, especially the City of Tampa with its tree protection rules, may also ask for a tree or topographical survey. Closing surveys sometimes include this, but often don't. Check the title block on your survey for the original surveyor — since they already have your lot on file, they can often update it faster and for less than a new survey.
Will you handle my HOA approval?+
A typical HOA / ARC submittal package includes signed and sealed plans, a site plan showing placement, and material and color specifications matched to the home. Final approval is decided by your community's architectural review board.
Can the pavilion match my house?+
Yes. Pavilion columns are commonly finished in stucco or Hardie siding painted to match the house, and the roof can be architectural shingle, concrete tile or standing seam metal matched to the home and HOA guidelines.
Engineering & hurricanes
How are your pavilions engineered for wind?+
A properly engineered pavilion is designed by a Florida-licensed PE to resist the wind loads the Florida Building Code requires for its specific address and design wind speed. That means continuous hold-downs from roof to footing, hurricane strapping at each connection and footers sized for uplift.
Why not buy a pergola or pavilion kit?+
Big-box aluminum and wood kits are usually designed for mild climates: thin members, surface anchors and no sealed engineering for the site. In a tropical storm they can become debris. A permitted, inspected, engineered structure is built like part of the home.
Electrical & lighting
Are the lights and fan wired in?+
Engineered pavilions commonly include recessed LED lighting and a fan-rated ceiling box. Power from the home must be routed by a licensed electrician, and the distance from the panel and any trenching affect the scope.
Still have a question?
Call or text (941) 705-7694.