Pinellas County · Pinellas County
Cypress Run: pavilion, pool & pergola rules
The bottom line
Covered outdoor structures are possible with HOA approval. Expect a review of placement, roof material and colors.
- Pavilions & pergolas
- Not in the public documents — confirm with the ARC before submitting.
- Setbacks & placement
- Not in the public documents — confirm with the ARC before submitting.
- Pools & screen enclosures
- Not in the public documents — confirm with the ARC before submitting.
- Height limits
- Not in the public documents — confirm with the ARC before submitting.
- Outdoor kitchens & fire features
- Electrical disconnects above DFE required. Not in the public documents — confirm with the ARC before submitting.
- Roof, color & materials
- Must match primary structure roof finish and stucco. Not in the public documents — confirm with the ARC before submitting.
- Builder design standards
- Various Custom Builders
- Where to submit
- Cypress Run HOA / Tarpon Springs Planning
- How approval works
- HOA ARC approval required prior to City of Tarpon Springs building permit application.
What the review committee will ask for
- Current boundary survey showing setbacks and easements
- Site plan with the pavilion footprint and distances to lot lines
- Elevations with roof material and colors matched to the home
- Signed and sealed engineering for the site’s design wind speed
- Contractor license and certificate of insurance
We prepare every item on this list for you.
Can't find your property survey?
The title company from your home purchase usually has it on file and can often email it the same day. Some cities, like Tampa, may also need a tree survey. See how to get yours
Florida law that applies here too
- Florida Statute 720 bars HOAs from requiring a county building permit before their own review.
- HOAs cannot prohibit solar panels, Florida-friendly landscaping or code-compliant hurricane protection.
- Pools need a 48-inch safety barrier under state law; HOAs regulate cage style, roof shape and color.
- HOA approval and the county building permit are separate — you need both.
- County and city accessory setbacks are often 3–5 ft from side and rear lines (outside easements), but your HOA can require more.
Summary of public community documents, provided as a guide only. Rules change — confirm with your HOA. Source document
The complete backyard
A pool without a pavilion is only half a backyard.
Planning a pavilion in Cypress Run? A successful ARC submittal pairs signed and sealed engineering with drawings matched to your community's rules. Florida Pavilions launches in 2027 — join the waitlist for updates.