Pinellas County · Pinellas County

Lansbrook Villages / Preserves: pavilion, pool & pergola rules

The bottom line

Covered outdoor structures are possible with HOA approval. Expect a review of placement, roof material and colors.

Pavilions & pergolas
Detached pavilions and pergolas require Master ARC approval and must not violate maximum impervious surface ratios.
Setbacks & placement
Defaults to Pinellas County accessory setbacks - confirm with ARC before submittal.
Pools & screen enclosures
Mansard pool cages preferred. Equipment must be heavily screened by approved landscaping or masonry walls.
Height limits
Defaults to Pinellas County accessory setbacks - confirm with ARC before submittal.
Outdoor kitchens & fire features
Outdoor kitchens permitted. Ventilation hoods must be concealed or finished to match the main house.
Roof, color & materials
Solid roofs must match primary residence (shingle or tile). Aluminum screen frames typically mandated in bronze or white. Heavy stucco finishes required.
Builder design standards
Marc Rutenberg, Arthur Rutenberg, Nohl Crest
Where to submit
Lansbrook Master Association / Melrose Management
How approval works
Lansbrook Master ARC review (often 30 days) plus village-level HOA approval required.

What the review committee will ask for

We prepare every item on this list for you.

Can't find your property survey?

The title company from your home purchase usually has it on file and can often email it the same day. Some cities, like Tampa, may also need a tree survey. See how to get yours

Florida law that applies here too

Summary of public community documents, provided as a guide only. Rules change — confirm with your HOA. Source document

The complete backyard

A pool without a pavilion is only half a backyard.

Planning a pavilion in Lansbrook Villages / Preserves? A successful ARC submittal pairs signed and sealed engineering with drawings matched to your community's rules. Florida Pavilions launches in 2027 — join the waitlist for updates.

Florida Pavilions is currently in pre-launch development for 2027. Architectural designs and specifications shown are for informational and waitlist purposes only; construction and installation services are not currently offered.

Join the 2027 priority waitlist →