Pasco County · Pasco County

Long Lake Ranch: pavilion, pool & pergola rules

The bottom line

Covered outdoor structures are possible with HOA approval. Expect a review of placement, roof material and colors.

Pavilions & pergolas
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Setbacks & placement
Pasco side: 5 ft from side and rear property lines (LDC Section 530). Hillsborough side: governed by specific site plan wetland/conservation easements.
Pools & screen enclosures
Pasco side enforcement requires screen cages to be maintained and not in disrepair up to 4 ft from grade.
Height limits
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Outdoor kitchens & fire features
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Roof, color & materials
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Builder design standards
Mattamy Homes, M/I Homes
Where to submit
Rizzetta & Company
How approval works
ARC approval and Pasco County Accela (or Hillsborough HillsGovHub) permit required based on exact lot location.

What the review committee will ask for

We prepare every item on this list for you.

Can't find your property survey?

The title company from your home purchase usually has it on file and can often email it the same day. Some cities, like Tampa, may also need a tree survey. See how to get yours

Florida law that applies here too

Summary of public community documents, provided as a guide only. Rules change — confirm with your HOA. Source document

The complete backyard

A pool without a pavilion is only half a backyard.

Planning a pavilion in Long Lake Ranch? A successful ARC submittal pairs signed and sealed engineering with drawings matched to your community's rules. Florida Pavilions launches in 2027 — join the waitlist for updates.

Florida Pavilions is currently in pre-launch development for 2027. Architectural designs and specifications shown are for informational and waitlist purposes only; construction and installation services are not currently offered.

Join the 2027 priority waitlist →