Wesley Chapel · Pasco County
Meadow Pointe (CDD I-IV): pavilion, pool & pergola rules
The bottom line
Covered outdoor structures are possible with HOA approval. Expect a review of placement, roof material and colors.
- Pavilions & pergolas
- No structure of a temporary character, trailer, tent, shack, garage, or other outbuilding shall be used at any time. Must be a permanent addition matching main house.
- Setbacks & placement
- 15 feet to the rear lot line and 5 feet to any interior side lot line (per Parcel 8 Unit 2). Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/water) elsewhere.
- Pools & screen enclosures
- Not in the public documents — confirm with the ARC before submitting.
- Roof, color & materials
- Any addition shall be of the same kind of material as is used in the main structure and shall conform architecturally with the main structure.
- Builder design standards
- Multiple Builders
- Where to submit
- Meadow Pointe CDD (Inframark / Rizzetta)
- How approval works
- ARC Application required via CDD Board of Supervisors; must be delivered to the MP Office with all documents to be placed on the review schedule.
What the review committee will ask for
- Current boundary survey showing setbacks and easements
- Site plan with the pavilion footprint and distances to lot lines
- Elevations with roof material and colors matched to the home
- Signed and sealed engineering for the site’s design wind speed
- Contractor license and certificate of insurance
We prepare every item on this list for you.
Can't find your property survey?
The title company from your home purchase usually has it on file and can often email it the same day. Some cities, like Tampa, may also need a tree survey. See how to get yours
Florida law that applies here too
- Florida Statute 720 bars HOAs from requiring a county building permit before their own review.
- HOAs cannot prohibit solar panels, Florida-friendly landscaping or code-compliant hurricane protection.
- Pools need a 48-inch safety barrier under state law; HOAs regulate cage style, roof shape and color.
- HOA approval and the county building permit are separate — you need both.
- County and city accessory setbacks are often 3–5 ft from side and rear lines (outside easements), but your HOA can require more.
Summary of public community documents, provided as a guide only. Rules change — confirm with your HOA. Source document
The complete backyard
A pool without a pavilion is only half a backyard.
Planning a pavilion in Meadow Pointe (CDD I-IV)? A successful ARC submittal pairs signed and sealed engineering with drawings matched to your community's rules. Florida Pavilions launches in 2027 — join the waitlist for updates.