Wesley Chapel · Pasco County

Meadow Pointe (CDD I-IV): pavilion, pool & pergola rules

The bottom line

Covered outdoor structures are possible with HOA approval. Expect a review of placement, roof material and colors.

Pavilions & pergolas
No structure of a temporary character, trailer, tent, shack, garage, or other outbuilding shall be used at any time. Must be a permanent addition matching main house.
Setbacks & placement
15 feet to the rear lot line and 5 feet to any interior side lot line (per Parcel 8 Unit 2). Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/water) elsewhere.
Pools & screen enclosures
Not in the public documents — confirm with the ARC before submitting.
Roof, color & materials
Any addition shall be of the same kind of material as is used in the main structure and shall conform architecturally with the main structure.
Builder design standards
Multiple Builders
Where to submit
Meadow Pointe CDD (Inframark / Rizzetta)
How approval works
ARC Application required via CDD Board of Supervisors; must be delivered to the MP Office with all documents to be placed on the review schedule.

What the review committee will ask for

We prepare every item on this list for you.

Can't find your property survey?

The title company from your home purchase usually has it on file and can often email it the same day. Some cities, like Tampa, may also need a tree survey. See how to get yours

Florida law that applies here too

Summary of public community documents, provided as a guide only. Rules change — confirm with your HOA. Source document

The complete backyard

A pool without a pavilion is only half a backyard.

Planning a pavilion in Meadow Pointe (CDD I-IV)? A successful ARC submittal pairs signed and sealed engineering with drawings matched to your community's rules. Florida Pavilions launches in 2027 — join the waitlist for updates.

Florida Pavilions is currently in pre-launch development for 2027. Architectural designs and specifications shown are for informational and waitlist purposes only; construction and installation services are not currently offered.

Join the 2027 priority waitlist →