Oakstead: pavilion, pool & pergola rules

The bottom line

Covered outdoor structures are possible with HOA approval. Expect a review of placement, roof material and colors.

Pavilions & pergolas
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Setbacks & placement
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Pools & screen enclosures
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Height limits
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Outdoor kitchens & fire features
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Roof, color & materials
Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/conservation easements) - confirm with ARC before submittal.
Builder design standards
Multiple Builders
Where to submit
Greenacre Properties / Rizzetta
How approval works
Oakstead ARC submittal required along with applicable sub-HOA review.

What the review committee will ask for

We prepare every item on this list for you.

Can't find your property survey?

The title company from your home purchase usually has it on file and can often email it the same day. Some cities, like Tampa, may also need a tree survey. See how to get yours

Florida law that applies here too

Summary of public community documents, provided as a guide only. Rules change — confirm with your HOA. Source document

The complete backyard

A pool without a pavilion is only half a backyard.

Planning a pavilion in Oakstead? A successful ARC submittal pairs signed and sealed engineering with drawings matched to your community's rules. Florida Pavilions launches in 2027 — join the waitlist for updates.

Florida Pavilions is currently in pre-launch development for 2027. Architectural designs and specifications shown are for informational and waitlist purposes only; construction and installation services are not currently offered.

Join the 2027 priority waitlist →