Wesley Chapel · Pasco County
Watergrass: pavilion, pool & pergola rules
The bottom line
Covered outdoor structures are possible with HOA approval. Expect a review of placement, roof material and colors.
- Pavilions & pergolas
- Not in the public documents — confirm with the ARC before submitting.
- Setbacks & placement
- No buildings or permanent structures shall be constructed within screen planting easements. Defaults to Pasco County accessory setbacks (typically 5 ft side/rear, 15 ft from wetlands/water) elsewhere.
- Pools & screen enclosures
- Flat roofs prohibited. Screen enclosures must use charcoal screen and bronze frame.
- Height limits
- Maximum height for main residence is 35 ft; flat roofs for screen enclosures are strictly prohibited. Pitch of screen roof must be shown on preliminary plans and approved.
- Roof, color & materials
- Exterior materials must be subdued/earth tones. Screened enclosures must be constructed with charcoal screen material and bronze frames ONLY. Mill-finish aluminum, white frames, and black frames are strictly prohibited. No aluminum roofing or sheet metal panels.
- Builder design standards
- Crown Community Development, Taylor Morrison, D.R. Horton, Meritage
- Where to submit
- Inframark / Watergrass POA
- How approval works
- Submittal requires two copies of scalable survey/site plan (min 1-inch = 20-ft) indicating lot lines, easements, drainage systems, and landscape plans with unit prices. Approval contingent on master grading plan compliance.
What the review committee will ask for
- Current boundary survey showing setbacks and easements
- Site plan with the pavilion footprint and distances to lot lines
- Elevations with roof material and colors matched to the home
- Signed and sealed engineering for the site’s design wind speed
- Contractor license and certificate of insurance
We prepare every item on this list for you.
Can't find your property survey?
The title company from your home purchase usually has it on file and can often email it the same day. Some cities, like Tampa, may also need a tree survey. See how to get yours
Florida law that applies here too
- Florida Statute 720 bars HOAs from requiring a county building permit before their own review.
- HOAs cannot prohibit solar panels, Florida-friendly landscaping or code-compliant hurricane protection.
- Pools need a 48-inch safety barrier under state law; HOAs regulate cage style, roof shape and color.
- HOA approval and the county building permit are separate — you need both.
- County and city accessory setbacks are often 3–5 ft from side and rear lines (outside easements), but your HOA can require more.
Summary of public community documents, provided as a guide only. Rules change — confirm with your HOA. Source document
The complete backyard
A pool without a pavilion is only half a backyard.
Planning a pavilion in Watergrass? A successful ARC submittal pairs signed and sealed engineering with drawings matched to your community's rules. Florida Pavilions launches in 2027 — join the waitlist for updates.